Case Study · Logistics
Logistics Hub Energy Optimization
How a 45,000 m² distribution center reduced energy consumption through LED retrofit, HVAC optimization and smart monitoring.
The challenge
A large regional distribution center faced rising energy costs across lighting and climate control, combined with corporate sustainability targets that required a measurable reduction in carbon intensity. Legacy high-bay lighting ran continuously, and the HVAC system operated without zoning or demand control.
Our approach
- Pre-visit telemetry analysis and 12-month utility benchmarking
- On-site energy audit with thermal imaging and sub-metering
- Industrial LED retrofit with daylight and occupancy controls
- HVAC optimization, zoning and smart energy monitoring
- Executive roadmap with prioritized investments and projected ROI
Results
35%
Energy reduction
18 mo
Full payback
1,450 t
CO₂/yr avoided
